Leave Your Message
Flange Bearing Housing - Precision Cast Copper Alloy by China Suppliers | Oil Pump Component from Factory
Hot Products

Flange Bearing Housing - Precision Cast Copper Alloy by China Suppliers | Oil Pump Component from Factory

This component is an essential part of oil pumps, specifically designed for optimal performance and durability.

,

 

,

Part Specifications (Length x Width x Height): φ128mm x 38.5mm, Weight: 1.42Kg

,

 

,

Material: ZCuSn10P1

,

 

,

As a leading manufacturer of oil pump components in China, our factory ensures the highest quality standards. We are committed to providing top-notch products that meet the demands of our customers. Our oil pump components are sourced from reliable suppliers, ensuring durability and efficiency in your applications.

Product Description

This is a part used in traditional fuel engine cars, oil pumps, its name is called flange bearing seat. The technical requirements of the parts are detailed below:

Mechanical Properties (GB/T 1176)
  • Single cast test rod evaluation
  • Tensile strength: ≥ 220 MPa
  • Bending strength: ≥ 130 MPa
  • Elongation: ≥ 3%
  • Brinell hardness: ≥ 80 HBW
Casting Tolerance & Surface
  • Tolerance Standard: GB/T 6414-DCTG6-GCTG7
  • Outer surface roughness: Ra 6.3
  • Residual convex of runner & cap: Within blank tolerance range
  • Pits: Must not affect the size evaluation of the machine
  • Defects: No casting defects affecting use function
Low Power & Quality Requirements
  • Surface: No cracks, pores, or feather crystals allowed
  • Inclusions: Small surface inclusions disallowed; large surface inclusions ≤ 0.5mm²
  • Microstructure: Grain size and porosity ≤ Grade 3
  • Post-machining: No loose holes > 1mm² after reference hole cutting (~1mm)
Compliance & Standards
  • Substances used meet GB/T 30512 regulation standards
  • Compliant with CE RoHs 2.0 environmental regulations

Development Background

New Customer & Initial Setup
This is a new customer, marking the first time we have developed these specific parts. Following a thorough background investigation of both parties, we signed the "Mold Development Agreement", "New Product Trial Production Agreement", and "Supplier Integrity Agreement" before starting development.
Challenging Development Cycle
The development cycle for this product was extremely tight, with the first sample delivery time set to 40 days. Processing presented high difficulty, particularly with a mounting hole tolerance requirement of ±0.012mm.
Leadership & Equipment Investment
From the receipt of the development notice, the project department led the initiative, with personal participation from our company's boss. After multiple rounds of meeting evaluations and on-site verifications, we invested in new processing equipment, successfully meeting all customer requirements on the second sample delivery.
Our Capability: Our company features a strong technical development team with the capability to develop OEM parts in the precision casting field. We provide integrated services from blank casting to machining. Our core philosophy is to pursue excellence and provide customers with efficient, high-quality products and services.

Frequently Asked Questions (FAQ)

Q What is this part and where is it used?
This part is a flange bearing seat, which is specifically used in the oil pumps of traditional fuel engine vehicles.
Q What are the mechanical property requirements for the flange bearing seat?
According to GB/T 1176 (evaluated via a single cast test rod), the part must achieve a tensile strength of ≥220MPa, bending strength of ≥130MPa, elongation of ≥3%, and Brinell hardness of ≥80HBW.
Q What casting tolerances and surface finishes are applied?
The casting tolerance is compliant with GB/T 6414-DCTG6-GCTG7. The outer surface roughness is specified at Ra 6.3, with residual runner and cap convex kept within the blank tolerance range.
Q What are the environmental and substance compliance standards?
All substances used in the production process strictly meet the requirements of the GB/T 30512 standards and CE RoHs 2.0 regulations.
Q How did you address the tight mounting hole tolerance and short development cycle?
The project required a ±0.012mm mounting hole tolerance within a 40-day first sample timeline. Our project department and executive leadership actively evaluated the process, conducted on-site verifications, and invested in new processing equipment to successfully meet all customer requirements by the second sample delivery.
Q What range of OEM manufacturing services do you offer?
We offer integrated, full-process services for precision casting OEM parts, covering everything from the raw blank production stage to final machining.